Free · No card · UK construction

Pass CHAS
first time.
Free masterclass.

The complete CHAS masterclass guide — what it checks, the exact document pack, and the real reasons firms get knocked back — plus the H&S policy, training matrix and RAMS the assessor asks for. Written by people who've passed it. No card. No sales call.

Instant download 20 free templates Editable Word docs
SITELYNX
Template Pack
Training
Matrix
SITELYNX
CHAS-Ready
H&S
Policy
SITELYNX
Accreditation Masterclass
How to
Pass CHAS
The masterclass — what it checks, the document pack, why firms fail, and how to pass first time.
Scheme
CHAS · SSIP core
Format
Editable Word .docx
Cost
Free — no card
20free templates
1,200+ BS/EN/NHBC references built in
Built around CDM 2015 · COSHH · LOLER · HSG168
No demos. No sales calls.
20 editable Word docs · part of the Lynx Group

Grabbed the CHAS guide? Here's the rest.

20 free templates — RAMS, QA, permits, toolbox talks and the everyday site paperwork. No card. Built around the UK regs you actually work to.

Accreditation & Qualifications

Flagship

How to Pass CHAS — Masterclass

Word · .docx

The complete masterclass on passing CHAS first time — what it actually checks, the exact document pack, the real reasons firms get knocked back, and how to prepare. Plain English. Nobody else gives this away.

  • What CHAS is, who operates it (Veriforce), and why principal contractors require it
  • The CHAS levels explained (Standard → Advanced → Elite) — pick the right one
  • The Common Assessment Standard — its 13 sections and the two assessment routes

Health & Safety Policy — CHAS-ready template

Word · .docx

A three-part Health & Safety Policy template — Statement of Intent, Organisation & Responsibilities, and Arrangements — structured to HSWA 1974 s.2(3) and mapped to the CHAS / SSIP core criteria.

  • Branded cover page with policy document-control block
  • Part 1 — Statement of Intent with HSWA / Management Regs / CDM 2015 commitments
  • Director / owner sign-off block (signature, name, position, date, review date)

Training Matrix — CHAS-ready template

Word · .docx

A training matrix template — people down the side, cards and qualifications across the top — with a colour-coded validity legend and issue / expiry tracking, because CHAS wants to see currency, not just a yes / no.

  • Branded cover page + how-to-use guide
  • Colour-coded status legend (valid / expiring soon / expired / N/A)
  • Wide matrix — 15 qualification columns × blank people rows to fill in

RAMS — Method Statements

RAMS — Working at Height

Word · .docx

Risk Assessment & Method Statement template for any working-at-height activity — MEWP, scaffold, mast climber, ladder.

  • Branded cover page with full document-control block
  • Project / Principal Contractor / Trade contractor metadata
  • Statutory references including HSG150 and INDG401

RAMS — COSHH (Hazardous Substances)

Word · .docx

Risk Assessment & Method Statement for work with hazardous substances — silica dust, cement, solvents, isocyanates, wood dust.

  • Branded cover page with full document-control block
  • Statutory references — COSHH 2002, CLP, EH40 Workplace Exposure Limits
  • Reg 7 control hierarchy walked through in order

RAMS — Manual Handling

Word · .docx

Risk Assessment & Method Statement for manual handling — lifting, carrying, pushing and pulling under the MHOR 1992.

  • Branded cover page with full document-control block
  • Statutory references — MHOR 1992, HSE L23, INDG143, the MAC tool
  • Avoid–assess–reduce hierarchy per MHOR reg 4

RAMS — Excavation & Groundworks

Word · .docx

Risk Assessment & Method Statement for trenches, foundations and drainage — collapse, buried services and plant-operative interface.

  • Branded cover page with full document-control block
  • Statutory references — CDM 2015 reg 22, HSG185, HSG47, PUWER, LOLER
  • Planning and control hierarchy (survey, support, segregate, inspect)

RAMS — Lifting Operations

Word · .docx

Risk Assessment & Method Statement for crane and telehandler lifts — LOLER 1998 and BS 7121 with roles and lift plan built in.

  • Branded cover page with full document-control block
  • Statutory references — LOLER 1998, PUWER, BS 7121, GS6 (overhead lines)
  • BS 7121 roles table (Appointed Person, supervisor, operator, slinger/signaller)

QA — Inspection & Test

QA Inspection — Substructure

Word · .docx

Inspection & Test Plan log for substructure works — foundations, ground beams, drainage to FFL.

  • Branded cover page with project + inspection metadata
  • Reference documents block citing BS 8500-1/2:2023, BS 4449:2005+A3:2016, BS 8000-4:2020, Eurocode 7
  • 9-stage Hold-and-Witness-point register with notify + notice-period columns

QA Inspection — Superstructure

Word · .docx

Inspection & Test Plan log for the frame — concrete and steel columns, beams, slabs and connections.

  • Branded cover page + project / inspection metadata
  • Reference documents — BS EN 206/8500, BS 4449, BS EN 13670, BS EN 1090-2, Eurocodes 2 & 3
  • 8-stage hold-and-witness-point register

QA Inspection — Below-Ground Drainage

Word · .docx

Inspection, test and CCTV log for foul and surface-water drainage — to Building Regs Part H and BS EN 1610.

  • Branded cover page + project / inspection metadata
  • Reference documents — Building Regs Part H, BS EN 1610, BS EN 752
  • 6-stage hold-and-witness-point register

QA Inspection — Brickwork & Blockwork

Word · .docx

Inspection & Test Plan log for masonry — cavity construction, wall ties, DPC, cavity trays and lintels.

  • Branded cover page + project / inspection metadata
  • Reference documents — BS EN 1996 (Eurocode 6), PD 6697, BS EN 845, BS 8000-3
  • 8-stage hold-and-witness-point register

Permits to Work

Permit to Work — Hot Works

Word · .docx

Welding, cutting, grinding — HSG168 + insurer-standard permit with 60-minute fire watch and detector isolation register built in.

  • Branded cover page + valid-from / valid-to permit window
  • 6 named hazards including welding fume IARC G1 reference
  • 8 standard controls (3 m clear, fire watch, extinguisher, LEV, sealing, isolation, qualification)

Permit to Work — Working at Height

Word · .docx

MEWP / scaffold / mobile tower permit under CDM 2015 + Work at Height Regs 2005 with rescue plan and wind threshold table built in.

  • Branded cover page + permit metadata
  • 5 named hazards including suspension trauma
  • 9 standard controls walked through Reg 6 hierarchy

Permit to Work — Confined Space

Word · .docx

Confined Spaces Regs 1997 + HSG258 permit with atmospheric thresholds, continuous monitoring log, standby-person responsibilities and rescue rigging.

  • Branded cover page + time-limited permit window
  • 6 named hazards including engulfment and entrapment
  • 9 standard controls (atmospheric test, ventilation, top man, retrieval line, LOTO)

Toolbox Talks

Toolbox Talks — Site Safety Pack (10 talks)

Word · .docx

Ten ready-to-deliver UK site toolbox talks in one document — each with key points and its own attendance register.

  • Branded cover page + how-to-use guide
  • Talk 1 — Working at Height
  • Talk 2 — Manual Handling

Site Records & Forms

Site Induction Record

Word · .docx

Site-specific induction record — content checklist, emergency information and a 14-name signed attendance register.

  • Branded cover page + project details
  • 12-topic induction content checklist with tick column
  • Site emergency information block (assembly, first-aiders, A&E, 999 address)

Daily Site Diary

Word · .docx

One-sheet-per-day site record — personnel, plant, deliveries, progress, delays and H&S. Your contemporaneous record for claims.

  • Branded cover page + project / date / weather header
  • Personnel-on-site table (company, numbers, hours)
  • Plant & equipment table (on/off hire)

Near-Miss / Incident Report

Word · .docx

Report and investigate near misses, incidents and injuries — with root-cause analysis and a RIDDOR check built in.

  • Branded cover page + report details
  • Event-type checklist (near miss → specified injury → fatality)
  • What happened / what could have happened write-in sections

Fire Risk Assessment — Construction Site

Word · .docx

Construction-phase fire risk assessment to the RRFSO 2005 and HSG168 — hazards, controls, action plan and emergency arrangements.

  • Branded cover page + site details
  • Reference — RRFSO 2005, HSG168, insurer hot-works requirements
  • Fire-hazard table (ignition / fuel / oxygen sources)
The templates are the floor

Stop filling in Word docs.
Run the whole site from your phone.

The templates get you out of a hole today. SiteLynx builds, signs and files all of it as you work — RAMS, QA, permits, toolbox talks, plant, diary — every module, every user, one price.

Solo
£12/mo
1 user · every module
Popular
Team
£29/mo
Up to 5 users
Business
£69/mo
Up to 15 users
Company
£149/mo
Up to 40 + API

14-day free trial. No card to start. Cancel any time.

Start your free trial

Outgrown the templates?

SiteLynx is the same paperwork in real software — AI-drafted RAMS, version control, mobile sign-off, snags, permits, plant, the lot. From £12 a month. Cancel any time.

See SiteLynx